Local News

Govt reveals completion date for Akure-Ikere road dualisation

News Update

THE Federal Ministry of Works has assured Nigerians that the Akure-Ikere Road dualisation project will be ready for inauguration by President Bola Tinubu in December, 2025.

The Federal Controller of Works in Ondo State, Olajide Hussein, gave the assurance in an interview with the News Agency of Nigeria (NAN) on Sunday in Akure.

Hussein explained that the 15-km Phase 1 of the Akure-Ita Ogbolu-Iju-Ikere Road dualisation will be completed and inaugurated in December by the President.

According to him, the Phase 1 of the road project cost N19 billion, while the Phase 2 is expected to gulp N23 billion.

He explained that it was the policy of the ministry to always do projects in phases so that road users will have unhindered access to one lane while contractor starts work on the second lane.

Hussein praised the Minister of Works, Dave Umahi, for being resilient to ensure that the project is delivered on schedule.

“Phase one covers 15-km single carriageway from Akure to Ekiti State border with some gaps; a gap of 3-km in between. The length of the road from Akure to Ikere, Ekiti State boundary is 18.438-km.

“Now the phase 1 of this project is 15-km, meaning the Phase 1 is not expected to cover the whole stretch of 18-km, though we expect the contractor to complete these 18 km by December and for President Bola Tinubu to inaugurate it.

“So, that there will be a smooth unbroken traffic between Akure and Ikere before coming back to the other lane, which is the Phase 2.

“You know when we have a single carriageway and the road is dualised, the policy of the ministry is to construct one lane first; not to do both lanes simultaneously.

“This is to solve the problem of traffic first before you now think of constructing the other carriageway,” he explained.

Hussein, who praised the quality of work done by the contractor, said the only challenge faced in the process of construction of the road was obstructions by buildings; temporary and permanently structures.

MESSAGE us @ https://Wa.me/+2348072633727 for business relationship, Advert, PR, Publicity, Awareness, Interviews, Feature Stories, Press Release/Statement and so on…

He, however, commended the affected property owners for removing their structures in collaboration with the state governments. (NAN)

YOU CAN READ MORE NEWS UPDATES AND INFO @ https://www.voiceairmedia.com

VAM News

Recent Posts

2027: Senator Yayi reveals plan to appoint late Ogogo if elected

2027: Senator Yayi reveals plan to appoint Ogogo into Govt Cabinet , culture and tourism…

2 hours ago

Obi, Alia Trade Blame Over Blocked Visit to Benue Community

The Nigeria Democratic Congress presidential candidate, Peter Obi, and the Benue State Government on Tuesday…

4 hours ago

2027: NDC Denies Misusing Aspirants’ Donations

The Nigeria Democratic Congress has dismissed claims that donations and levies collected from aspirants ahead…

4 hours ago

FG, NYSC Plan Digital Link of Education Records to End Certificate Fraud

The Federal Government has announced plans to fully integrate education records with the National Youth…

4 hours ago

US Imposes Sanctions on Iran’s Remaining Airlines and Aviation Service Providers

The United States has imposed sanctions on all remaining Iranian airlines not previously blacklisted, as…

4 hours ago

Putin and Trump Hold ‘Frank’ Phone Call After US Envoys Visit Moscow

Russian President Vladimir Putin and US President Donald Trump held an “extremely frank” phone conversation…

4 hours ago