BREAKING: FG bans use of laterite for road construction

The federal government has announced a ban on the use of laterite as a base for road construction across the country.

 

 

Minister of Works, Senator David Umahi who made the announcement while inaugurating a committee for the supervision of the Reconstruction of Benin – Warri dual carriageway and the dualization of East – West Road, Port Harcourt – Onne Port junction road in River State, said contractors should henceforth use lumps, sharp sand and stone base to form the base before laying of concrete or asphalt pavement.

 

 

Umahi stated that laterite has a limited load bearing capacity, susceptible to erosion and weathering especially in areas with heavy rainfall and this can lead to degradation of the road surface overtime, maintenance challenge and does not last long.

READ ALSO...  2024 Poll: What will qualify Edo next governor- Barrister Uwoghiren

 

 

A statement signed and released by the Director (Information), Press and Public Relations of the Ministry, Lere-Adams Blessing read;

 

 

“We are giving very serious attention to the roads between Benin and Warri. The road between Eleme and Onne Port, we are mindful of the site conditions of these roads, the water conditions and the boreholes instead of pot holes on these roads.

 

“No more laterite, contractors are now to use lumps, sharp sand and stone base in place of laterite.

 

“The committee must implement the contract agreement with maintenance culture as key. Committee members are to monitor the contractors closely to make sure things are done right.

READ ALSO...  Gov Matawalle orders lockdown in Zamfara LGAs over banditry

 

“I want to say that road infrastructure is one of the key factors for the revolution of our commerce, education, security and power in this country and Mr President is committed to our road infrastructure, so we are on a mission and we must take back our country.

 

“We are not at war with the contractor but contractors should not put the public to suffering. Proper daily supervision and documention of what the contractor is doing is compulsory.

 

“They must ensure the new method of construction is followed and maintenance follows too because it is part of the elements of the contract and any offence is punishable.”

 

 

 

 

 

Akanji Philip

Akanji Philip has been working as a reporter with VOICE AIR MEDIA, both onsite at the head office in Odi-Olowo, Osogbo, and remotely. He has covered events at notable political venues, involving prominent figures such as former Osun Governor Adegboyega Oyetola, current Osun State Governor Senator Isiaka Adetunji Adeleke, former Vice President Professor Yemi Osinbajo, the late Ondo Governor Rotimi Akeredolu, Oyo State Governor Seyi Makinde, and various other representatives and lawmakers. In addition, he has represented the company at various press conferences at police stations and has reported on occasions featuring entertainers and actors, such as Kola Oyewo during Oba-Ile Day in Osun State, among others. -Phone Number: +2349058501092, +2348137827714 -Email: akanjiphilips100@gmail.com

Learn More →

Leave a Reply

Your email address will not be published. Required fields are marked *

3 + 2 =